dV/dt = QentrĆ©e ā QsortieV: m³; t: h if Q is in m³/h.
Use when: Use a factor of 1/3,600 if time is counted in seconds.
Intu LabUnderstanding through experienceConnect equipment, connections, capacities and instrumentation of a circuit.
A flowsheet represents the operations and flows of a process. The material balance must remain consistent at each node; insufficient capacity can limit an output and cause accumulation.
The mock test of this workshop uses a virtual tracer without energy. It calculates hydraulic flow rates and alarms, without predicting the reactions of ores and reagents or the chemical yield of a complete plant.
dV/dt = QentrĆ©e ā QsortieV: m³; t: h if Q is in m³/h.
Use when: Use a factor of 1/3,600 if time is counted in seconds.
v = Q/A ; A = ĻD²/4Q: m³/s; D: m; A: m²; v: m/s.
Use when: Convert m³/h and diameters to mm before calculation.
hf = f (L/D) v²/(2g)hf: m of fluid; f: Darcy factor; L, D: m.
Use when: Regular losses; singular losses and the choice of f require a complementary model.
Define connections and identify hydraulic bottlenecks.
Test routing, distributions and instrument reading.
Set a capacity lower than the supply flow rate of a tank. Observe outlet flow, level and alarm, then explain the results.
This sheet explains the principles and their assumptions. Educational simulation can simplify the process; an industrial model requires suitable data and validation.